Draw management

Know what is missing
before your lender asks.

Builtly tracks every draw requirement: photos, waivers, inspection reports, budget variance. It surfaces what's incomplete before you submit. Draws go through clean. First time.

Configured to your lender's checklist
No credit card required
Personal onboarding call
Builtly · Draw ReadinessProduct preview · example data

Projects

Sample Residence

Framing

Example Build

Foundation

Demo Project

Finish

Sample Residence · Framing Phase

Draw Request #3: Framing Phase

2 ITEMS OPEN
Draw readiness67%

Phase photos

12 photos, framing complete, organized by phase

Budget summary

Cost detail on file, current phase

Framing inspection report

Uploaded Aug 19, on file

General subcontract

Framing sub, on file, current

Electrical lien waiver

Electrical sub, waiver requested, pending response

Plumbing lien waiver

Plumbing sub, phase not yet confirmed

2 items need attentionReview checklist

Why draws fail

The lender doesn't care that you thought the package was ready.

A draw rejection doesn't happen because you forgot something obvious. It happens because the documentation you needed was scattered across three phones, two email chains, and a sub who didn't respond yet.

By the time you figure out what's missing, the lender is waiting, the sub is already on the next phase, and another draw cycle starts while the last one is still unresolved.

Photos exist but no one organized them

Field crew uploads to their phone. The super shares to group chat. No one indexed them by phase. Come draw time, you're hunting.

Waivers show up late, or not at all

The sub signed the waiver after the draw was due. Or never did. You sent an email reminder. No response. The draw waits.

The budget spreadsheet is always one update behind

The change order from two weeks ago didn't make it in yet. The draw amount is off. The lender notices. You restart.

How it works

The draw is built as the phase is built.

Builtly collects draw documentation continuously throughout the phase, not in a sprint the night before you submit.

Phase opens

When you mark a phase active, Builtly applies the required documentation checklist: photos, inspections, waivers, budget milestones.

Documentation flows in

Field crew uploads photos from the app. Inspection reports are attached as they arrive. Budget updates post when change orders are approved.

Waivers requested and tracked

When a phase closes, send waiver requests to the subcontractors who worked that phase. Track who has responded and what is still outstanding.

Readiness check before submission

Before you hit submit, the Draw Readiness view shows exactly what's complete, what's outstanding, and what's blocking. No surprises at the lender.

Package goes to your lender

A clean, organized draw package: photos, waivers, budget variance, inspection reports. Ready for your lender's requirements.

Manual vs. Builtly

The same draw. A different experience.

Without BuiltlyAspectWith Builtly
4 phones and a group textWhere photos live
Organized by phase, uploaded from the field
Email chains, reminders by handLien waiver collection
Waiver requests sent and tracked
1–3 hours pulling docs togetherDraw package assembly
Organized from what's already in the project
Open the spreadsheet, hope it's currentBudget vs. actual
Updated when change orders are approved
Physical packet or scattered emailBank submission
Documentation organized and ready for submission

Specific outcomes

What builders report after switching to Builtly draws.

Lenders stop kicking draws back.

When every required item is present and organized, rejections don't happen. The readiness check catches what the lender would catch, before submission.

Waivers tracked without guessing.

Send waiver requests when a phase closes. Track who has responded and what is still outstanding before the draw goes out.

Draw prep time drops from hours to minutes.

Because documentation was collected throughout the phase, there's nothing to hunt for at draw time. The package assembles from what's already in the system.

Budget variance is always current.

Change orders flow directly into the draw package. The lender's budget-to-actual comparison reflects reality, not last week's spreadsheet.

Get started

Submit your next draw clean.

We configure your draw checklist to match your lender's requirements. One project. One call. No commitment until it works.

Apply for Early Access

No credit card required. We reach out personally.